Siders-Visp railroad line in Valais open again from Thursday

Published: Wednesday, Jul 3rd 2024, 18:30

العودة إلى البث المباشر

Rail traffic on the Siders-Visp line in Valais, which was interrupted between Leuk and Gampel, is running again as planned from Thursday. The repairs following the devastating storms are on track.

According to Wednesday's forecasts, train services should resume on Thursday at 12 noon, as the SBB announced on Wednesday evening. The water level of the Rhone had dropped and the repair work could soon be completed.

However, SBB recommends checking the online timetable before every journey. Initially, they had expected to be able to lift the interruption on Tuesday.

©كيستون/إسدا

قصص ذات صلة

ابق على اتصال

جدير بالملاحظة

the swiss times
إنتاج شركة UltraSwiss AG، 6340 بار، سويسرا
جميع الحقوق محفوظة © 2024 جميع الحقوق محفوظة لشركة UltraSwiss AG 2024