Almost two hours waiting time due to traffic jam in front of Gotthard north portal

Published: Saturday, Sep 14th 2024, 12:10

العودة إلى البث المباشر

An eleven-kilometre-long traffic jam formed in front of the Gotthard north portal between Erstfeld and Göschenen in the canton of Uri shortly before midday on Saturday. Road users had to put up with a waiting time of one hour and 50 minutes.

Traffic was also backed up for eight kilometers in front of the south portal between Quinto and the Airolo rest area in Ticino, as the Touring Club of Switzerland (TCS) wrote on the X short message service. There was a waiting time of almost one and a half hours.

©كيستون/إسدا

قصص ذات صلة

ابق على اتصال

جدير بالملاحظة

the swiss times
إنتاج شركة UltraSwiss AG، 6340 بار، سويسرا
جميع الحقوق محفوظة © 2024 جميع الحقوق محفوظة لشركة UltraSwiss AG 2024