Another ten-kilometer traffic jam in front of the Gotthard north portal

Published: Saturday, Jul 27th 2024, 05:20

العودة إلى البث المباشر

The traffic jam in front of the Gotthard north portal again reached a length of ten kilometers between Erstfeld and Göschenen UR on Saturday morning. For southbound travelers, this meant waiting times of up to one hour and 50 minutes.

The length of the traffic jam in front of the north portal of the Gotthard road tunnel had initially shortened somewhat on Friday evening, according to reports from the Touring Club Switzerland (TCS) on the X short message service. By midday on Friday, the traffic jam in the southbound direction was already ten kilometers long.

Patience was also required in the northbound direction late on Friday evening. According to the TCS, traffic between Quinto and Airolo TI was backed up for a length of two kilometers.

©كيستون/إسدا

قصص ذات صلة

ابق على اتصال

جدير بالملاحظة

the swiss times
إنتاج شركة UltraSwiss AG، 6340 بار، سويسرا
جميع الحقوق محفوظة © 2024 جميع الحقوق محفوظة لشركة UltraSwiss AG 2024