Gotthard Base Tunnel reopens on September 2

Published: Thursday, Jun 27th 2024, 10:20

العودة إلى البث المباشر

Rail operations through the Gotthard Base Tunnel can resume in full on September 2. According to SBB, the repair work in the western tube of the tunnel is on track.

Since the derailment of a freight train in the Gotthard Base Tunnel on August 10, 2023, SBB has been working at full speed to repair the tunnel. This is continuing as planned, SBB announced to the media in Bern on Thursday.

The next step was test and trial operation. During test operation, empty trains are used to test the new systems, in particular the track, and to check the interaction of all systems.

SBB continues to estimate the material damage caused by the train derailment in August 2023, including loss of earnings, at around CHF 150 million.

©كيستون/إسدا

قصص ذات صلة

ابق على اتصال

جدير بالملاحظة

the swiss times
إنتاج شركة UltraSwiss AG، 6340 بار، سويسرا
جميع الحقوق محفوظة © 2024 جميع الحقوق محفوظة لشركة UltraSwiss AG 2024