Traffic jam on the Gotthard again reaches a length of ten kilometers

Published: Sunday, Jul 21st 2024, 11:50

العودة إلى البث المباشر

Traffic in front of the north portal of the Gotthard road tunnel was still backed up for ten kilometers between Erstfeld and Göschenen UR late Sunday morning. This meant a waiting time of one hour and 40 minutes.

This was announced by the Touring Club Switzerland (TCS) via the short message service X. Traffic was also backed up for four kilometers in front of the Gotthard south portal, where travelers had to expect a waiting time of up to 40 minutes.

Heading south, the TCS recorded the first kilometer of traffic jam between Wassen and Göschenen UR shortly before 05:30 on Sunday. This meant that the traffic jam was slightly later than the day before: the TCS had already reported a traffic jam six kilometers long at 03:00 on Saturday night.

In the early afternoon on Saturday, the travelers lined up in their vehicles heading south for a maximum of fourteen kilometers.

©كيستون/إسدا

قصص ذات صلة

ابق على اتصال

جدير بالملاحظة

the swiss times
إنتاج شركة UltraSwiss AG، 6340 بار، سويسرا
جميع الحقوق محفوظة © 2024 جميع الحقوق محفوظة لشركة UltraSwiss AG 2024