Railroad line from Ticino to the north open again after interruption

Published: Monday, Apr 1st 2024, 09:50

Zurück zu Live Feed

The Bellinzona TI - Erstfeld UR railroad line was reopened early on Easter Monday after an interruption. During the night of Easter Monday, operations on this route were suspended due to the risk of avalanches.

At 7.30 a.m., SBB announced on the Railinifo rail information service that the route from Lugano to Zurich and Basel was open again. The lines affected were IC2 (Lugano - Zurich), IC21 (Lugano - Basel), EC, IR26, IR46 and S10.

According to the press release, there was a risk of avalanches between the Ticino villages of Faido and Airolo.

©Keystone/SDA

Verwandte Geschichten

In Kontakt bleiben

Erwähnenswert

the swiss times
Eine Produktion der UltraSwiss AG, 6340 Baar, Schweiz
Copyright © 2024 UltraSwiss AG 2024 Alle Rechte vorbehalten