Traffic jams in the south on the last vacation weekend in many cantons

Published: Saturday, Aug 10th 2024, 11:50

Zurück zu Live Feed

On the last vacation weekend before school starts in many cantons, many travelers are returning to Switzerland by car. As a result, the traffic jam in front of the Gotthard south portal reached a length of 9 kilometers on Saturday morning.

As reported by the Viasuisse traffic service, cars had to wait around one and a half hours between Faido TI and the Airolo TI service area to enter the 16.9-kilometer tunnel.

According to Viasuisse, the tunnel was temporarily closed in both directions at 9 a.m. because a motorhome had to be towed away after an accident with a broken-down vehicle. Later, the entrance at the north portal was closed due to safety construction work. As a result, there was a 9-kilometre-long traffic jam until around midday.

School starts on Monday in the cantons of Aarau, Appenzell-Inner- and Ausserrhoden, Basel-Stadt and -Land, the German-speaking part of Bern, Glarus, Graubünden, Obwalden, St. Gallen, Schaffhausen, Schwyz, Solothurn and Thurgau.

©Keystone/SDA

Verwandte Geschichten

In Kontakt bleiben

Erwähnenswert

the swiss times
Eine Produktion der UltraSwiss AG, 6340 Baar, Schweiz
Copyright © 2024 UltraSwiss AG 2024 Alle Rechte vorbehalten