Beznau 1 nuclear power plant is back on the grid after an unplanned long shutdown

Published: Monday, Oct 28th 2024, 16:50

Zurück zu Live Feed

The Beznau 1 nuclear power plant in the canton of Aargau is back on the grid after several weeks of downtime. The investigations into the feedwater tanks have been completed, as the energy company Axpo announced on Monday.

According to Axpo, the Beznau 1 nuclear power plant was taken off the grid on September 28 for repair work on a power cable. This work proceeded according to plan, but start-up was delayed due to the newly available results of an inspection of the feedwater tanks.

The investigations have now been completed and the safety of the feedwater tanks, which are located in the turbine building in the non-nuclear part of the plant, has been confirmed. The Swiss Federal Nuclear Safety Inspectorate (Ensi) has been informed of the results.

©Keystone/SDA

Verwandte Geschichten

In Kontakt bleiben

Erwähnenswert

the swiss times
Eine Produktion der UltraSwiss AG, 6340 Baar, Schweiz
Copyright © 2024 UltraSwiss AG 2024 Alle Rechte vorbehalten