Long waiting times on the south side of the Gotthard road tunnel

Published: Sunday, Jun 30th 2024, 13:10

Zurück zu Live Feed

On the south side of the Gotthard road tunnel, the northbound journey took time. At midday on Sunday, the traffic jam on the A2 was twelve kilometers long, as the Ticino cantonal police and the TCS reported on X.

According to TCS traffic information, this meant a waiting time of around two hours on the way north.

On the northern side of the tunnel, the queue of cars between Amsteg UR and Göschenen UR was five kilometers long at lunchtime. According to TCS, this meant a time loss of around 50 minutes.

©Keystone/SDA

Verwandte Geschichten

In Kontakt bleiben

Erwähnenswert

the swiss times
Eine Produktion der UltraSwiss AG, 6340 Baar, Schweiz
Copyright © 2024 UltraSwiss AG 2024 Alle Rechte vorbehalten