Return Traffic is Congested at Gotthard.

Published: Saturday, Aug 12th 2023, 10:00

Aktualisiert am: Freitag, 13. Oktober 2023, 14:12

Zurück zu Live Feed

The Gotthardstrassentunnel is experiencing heavy traffic due to the return of holidaymakers from the south of Switzerland. On Saturday morning, the traffic jam at the south portal in Airolo TI exceeded 10 kilometres in length, causing a delay of one hour and 40 minutes for drivers travelling from the Ticino to the German-speaking part of Switzerland. The traffic jam at the north portal in Göschenen UR was shorter, at six kilometres. As a result of the derailment on Thursday, no trains are able to pass through the Basistunnel, meaning that passengers travelling by train on the Gotthard axis must also expect longer journey times.nnnnnnnn









©Keystone/SDA

Verwandte Geschichten

In Kontakt bleiben

Erwähnenswert

the swiss times
Eine Produktion der UltraSwiss AG, 6340 Baar, Schweiz
Copyright © 2024 UltraSwiss AG 2024 Alle Rechte vorbehalten