Encore un long embouteillage devant le tunnel routier du Gothard

Published: Sunday, Apr 28th 2024, 15:40

Retour au fil d'actualité

La circulation intense en direction du sud s'est poursuivie dimanche. Dans l'après-midi, un embouteillage de 16 kilomètres de long s'est formé devant le portail nord du tunnel routier du Saint-Gothard à Göschenen UR.

For drivers, this meant a waiting time of two hours and 40 minutes, as announced by the Touring Club of Switzerland (TCS) on the short message service X. The highway entrances in Göschenen and Wassen were closed.

By midday, the traffic jam at the Gotthard north portal had already reached a length of ten kilometers. The traffic information services recommended the San Bernardino route through the canton of Graubünden or the A9 via Simplon through the Valais as alternative routes.

A traffic jam up to 15 kilometers long had already formed on the A2 in the canton of Uri on Saturday. The traffic jam only cleared up in the early evening hours.

©Keystone/SDA

Articles connexes

Rester en contact

À noter

the swiss times
Une production de UltraSwiss AG, 6340 Baar, Suisse
Copyright © 2024 UltraSwiss AG 2024 Tous droits réservés