Ten kilometers of traffic jam in front of the Gotthard tunnel heading south

Published: Friday, May 24th 2024, 13:10

Updated At: Friday, Jul 12th 2024, 14:50

Retour au fil d'actualité

Vacation traffic heading south caused a traffic jam ten kilometers long at the Gotthard north portal on Friday afternoon. Travelers had to expect waiting times of up to one hour and 40 minutes between Erstfeld and Göschenen UR.

The new avalanche of traffic in front of the Gotthard portal had been on the cards. Traffic was already backed up for two kilometers between Wassen and Göschenen UR at 7 o'clock in the morning, as the Touring Club Switzerland (TCS) announced on Friday via the short message service X.

Traffic was also backed up at the Gotthard south portal: between Quinto and Airolo TI, the TCS recorded a traffic jam four kilometers long. Travelers had to reckon with a time loss of up to 40 minutes. Last weekend and the following Monday, there were already traffic jams at the Gotthard in both directions with a maximum length of 14 kilometers.

©Keystone/SDA

Articles connexes

Rester en contact

À noter

the swiss times
Une production de UltraSwiss AG, 6340 Baar, Suisse
Copyright © 2024 UltraSwiss AG 2024 Tous droits réservés