Otro largo atasco frente al túnel de carretera de San Gotardo

Published: Sunday, Apr 28th 2024, 15:40

Volver a Live Feed

El domingo continuó el intenso tráfico en dirección sur. Por la tarde, se formó un atasco de 16 kilómetros frente a la boca norte del túnel de carretera de San Gotardo, en Göschenen UR.

For drivers, this meant a waiting time of two hours and 40 minutes, as announced by the Touring Club of Switzerland (TCS) on the short message service X. The highway entrances in Göschenen and Wassen were closed.

By midday, the traffic jam at the Gotthard north portal had already reached a length of ten kilometers. The traffic information services recommended the San Bernardino route through the canton of Graubünden or the A9 via Simplon through the Valais as alternative routes.

A traffic jam up to 15 kilometers long had already formed on the A2 in the canton of Uri on Saturday. The traffic jam only cleared up in the early evening hours.

©Keystone/SDA

Historias relacionadas

Mantente en contacto

Cabe destacar

the swiss times
Una producción de UltraSwiss AG, 6340 Baar, Suiza
Copyright © 2024 UltraSwiss AG 2024 Todos los derechos reservados