Rapperswil-Jona Supports the City Tunnel

Published: Sunday, Sep 10th 2023, 13:00

Updated At: Friday, Oct 13th 2023, 14:12

Back to Live Feed

The citizens of Rapperswil-Jona SG voted in favour of a city tunnel on Sunday, with 59.5% of the vote. The tunnel will cost an estimated one billion Swiss francs and will run from Seedamm to the A15 motorway, with two connections underneath the city. The tunnel is expected to take seven to eight years to build and will be funded by the canton of St. Gallen. This is not the first time that measures to reduce traffic in the second largest city in St. Gallen have been discussed, but twelve years ago a tunnel option was rejected by the voters.nnnnnnnnnnnnnnnnnnnnnnnnnn









©Keystone/SDA

Related Stories

Stay in Touch

Noteworthy

the swiss times
A production of UltraSwiss AG, 6340 Baar, Switzerland
Copyright © 2024 UltraSwiss AG 2024 All rights reserved